ARMED FORCES READINESS CENTER

Joint Forces Headquarters
Montgomery, AL
Square Footage: 216,000 SF
Cx Cost: $69,600.00
Project Value: $41M
Completion Date: May 2012
Owner’s Satisfaction Level: Satisfied

The three-story readiness center houses one or more units of the State Army National Guard. The center includes an office building, locker building, and a maintenance building. The commissioning scope of work included HVAC systems, domestic and conditioning water systems, building automation systems, photovoltaic systems, and lighting controls.

TSCx commissioned the following systems:

• Building Automation Systems

• Split System Heat Pump Units

• Cooling Tower

• Outside Air Systems

• Computer Room A/C Units

• Boiler

• Rooftop Air Handling Units

• Fans

• Heat Recovery Systems

• Water Source Heat Pump Units

• Ductwork

• Pumps

• Kitchen Exhaust System

• Domestic Water System

• Lighting Controls

• Test & Balance Reports

OWNER: The Epsten Group, Inc. ♦ Lorraine Cunanan, AIA, CCS, LEED-AP – 404.577.0370

GENERAL CONTRACTOR: Jim Parker Building Company, Inc. ♦ Wade Kennedy – 334.319.2692

Previous
Previous

C-17 Two-Bay Corrosion / Fuel Hangar

Next
Next

RENOVATION OF RANGER BARRACKS BUILDING 2935